Trip time characteristics (IEC60255-121)
Short line
Long line
Note: IED was tested on 50Hz system. Relay operation time will be reduced by 15–20%
approximately, when the IED is running on 60Hz system.
ZS for three-phase fault
(see page 1687)
(see page 1689)
- 1686 -
6F2S1914 (0.49)
ZG for ground fault
(see page 1688)
(see page 1690)
GRL200 (Soft 033 & 037)