Field Setting from Outdoor Unit

2. Field Setting from Outdoor Unit
To continue the configuration of the VRV heat recovery system, it is required to give some input to
the PCB of the unit. This chapter will describe how manual input is possible by operating the BS
buttons/DIP switches on the PCB and reading the feedback from the 7 segment displays.
For VRV heat recovery system it is alternatively possible to make several commissioning field
setting through a personal computer interface (for this, an optional cable is required). The installer
can prepare the configuration (off-site) on PC and afterwards upload the configuration to the
system.
2.1

DIP Switch Setting when Mounting a Spare PCB

Caution
 After replacement with spare PCB, be sure to make settings shown in the table on the following
 Enforce a re-initialization of communication: hold press the RETURN (BS3) button for minimum
 After initialization, a test operation is required from outdoor unit (hold the SET (BS2) button until
(3) BS button
(BS1~BS3)
239
page. The procedure for making settings of spare PCB is different from that used for factory
settings described above. Be sure to refer to the table shown on the following page in order to
make settings of spare PCB after replacement.
5 seconds.
indication t01 appears).
(2) Segment display
(SEG1~SEG3)
(4) DIP switch
(DS1-1~4) (DS2-1~4)
Connection terminal
for transmission use
SiUS372201EB
Initial position of DIP switches („)
ON
OFF
1 2 3 4
1 2 3 4
DS1
(1) Microcomputer normal monitor
(HAP)
Part 5 Field Settings and Test Operation
DS2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrv emerion reyq-aatjbVrv emerion reyq-aaydaVrv emerion reyq-aaydbVrv emerion reyq72aatjaVrv emerion reyq72aaydbVrv emerion reyq72aatjb ... Show all

Table of Contents