Operation Flowchart - Daikin VRV EMERION REYQ-AATJA Service Manual

Table of Contents

Advertisement

SiUS372201EB

1. Operation Flowchart

For detailed description of each function in the flow below, refer to the details on related function on
the following pages.
Stop control
(1) Stop due to error
(2) When system is in stop control
(3) Sub unit stops during master unit control
Standby control
(1) Restart standby
(2) Crankcase heater control
Thermostat ON
Startup control
(include pressure equalization before startup)
(1) Startup control in cooling
(2) Startup control in heating
End of
startup
control
Basic control
(1) Normal control
(2) Compressor PI control
(3) Operation priority and rotation of
compressors
(4) Compressor step control
(5) Electronic expansion valve PI control
(6) Step control of outdoor fans
(7) Heat exchanger control
Protection control
(1) High pressure protection control
(2) Low pressure protection control
(3) Discharge pipe protection control
(4) Inverter protection control
Note(s)
1. If the indoor unit stops or the thermostat turns OFF while in oil return operation or defrost
Part 4 Functions and Control
Conditions met for oil return
Conditions met for defrosting
Conditions met for outdoor unit rotation
End of outdoor unit rotation
operation, pump down residual operation is performed on completion of the oil return operation
or defrost operation.
End of oil return operation
End of defrost operation
Operation Flowchart
Special control
(1) Pump down residual operation
Thermostat OFF
(2) Oil return operation (note 1)
(3) Defrost operation (note1)
(4) Outdoor unit rotation
144

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrv emerion reyq-aatjbVrv emerion reyq-aaydaVrv emerion reyq-aaydbVrv emerion reyq72aatjaVrv emerion reyq72aaydbVrv emerion reyq72aatjb ... Show all

Table of Contents