Unpacking And Checking - Huawei UPS5000-E-60K-F60 User Manual

Hide thumbs Also See for UPS5000-E-60K-F60:
Table of Contents

Advertisement

UPS5000-E-(60 kVA-160 kVA)
User Manual (Low Voltage)
Model
UPS Capacity
160 kVA

3.1.4 Unpacking and Checking

Context
● To prevent the UPS from falling over, secure it to a pallet truck using ropes
● To prevent shocks or falls, move the UPS gently. After placing the UPS in the
● To prevent dust from settling on the UPS, leave the original plastic coat on until
Procedure
Step 1 Use a pallet truck to transport the UPS to the installation position.
Step 2 Check the UPS packing.
Step 3 Hold the sliding plate steady. Cut and remove the binding tapes. Put down the
sliding plate gently.
Issue 05 (2024-01-30)
Component
Bypass input circuit
breaker
Mains input circuit breaker
Bypass input circuit
breaker
NO TE
● The upstream input circuit breakers recommended in the table are for reference only.
● If multiple loads are connected, specifications for branch circuit breakers must not
exceed the recommended specifications.
● The circuit breaker selection principle is to protect loads and cables, and the cascading
principle is to achieve specific protection.
NO TICE
before moving it.
installation position, unpack it and take care to prevent scratches. Keep the UPS
steady during unpacking.
installation is required.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Specifications
Vendor
T5N400 TMA
R400 FF 3P
T6N630 TMA
R630 FF 3P
T5N630 TMA
R500 FF 3P
3 Installation
58

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-e-100k-f100Ups5000-e-160k-f160

Table of Contents