5.6.1.1 Forced Equalized Charging Test

Context
Before a forced equalized charging test, ensure that:
● The mains input is normal.
● Batteries are properly connected.
● Batteries are not in the equalized charging state.
Procedure
Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery
Maint.
Step 2 Tap Start next to Forced Equalized Charging to start a forced equalized charging
test.
Figure 5-9 Starting a forced equalized charging test
----End
Issue 05 (2024-01-30)
NO TICE
NO TE
The forced equalized charging test automatically stops in any of the following cases:
● The forced equalized charging test duration reaches the forced equalized charging
protection time (12–24 h, 18 h by default).
● The UPS generates a battery overtemperature, overvoltage, or overcurrent alarm.
● An alarm is generated.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Operations
191

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-e-100k-f100Ups5000-e-160k-f160

Table of Contents