1.3 Transportation, Unpacking, and Checking

● Only trained personnel are allowed to move the cabinet. Use a forklift truck to
● To prevent the equipment from falling over, secure it to a pallet truck using
● After placing the equipment in the installation position, unpack it and take care
● After unpacking, check whether the fastening components and removable
● If the installation environment is poor, take dustproof and anti-condensation
Step 1 Use a forklift truck to transport the cabinet to the installation position.
Step 2 Remove the packing materials and set the accessories aside.
Step 3 Check that the cabinet is intact.
1.
2.
Step 4 Remove the bolts that secure the cabinet to the pallet and move the cabinet from
the pallet.
Issue 01 (2023-03-20)
NO TICE
remove the packed cabinet from the pallet.
ropes before moving it. Move the equipment with caution to avoid bumping or
falling, which may damage the equipment.
to prevent scratches. Keep the equipment stable during unpacking.
components are loose. If they are loose, notify the carrier and manufacturer
immediately.
measures (for example, use a dust cover, plastic film, or fabric cloth) after
unpacking the equipment to prevent condensation and dust buildup, which
may corrode the equipment.
Visually inspect the cabinet appearance for damage caused during
transportation. If any damage is found, report the photos to the carrier
immediately.
Check whether the cabinet accessories are complete and correct according to
the packing list. If there is any discrepancy, keep a record and contact the
supplier immediately.