Maintenance
Post maintenance activities
WARNING
Risk of injuries by explosion of pressurized container.
Explosion of pressurized container could result in death or serious injuries.
u Do not pierce or burn the pressurized container, even after use.
u Protect the pressurized container from sunlight.
u Make sure the pressurized contained is not exposed to temperatures over 50 °C (122 °F).
Scope
Spray painting may be necessary in the following cases:
– Touch-ups following damage to the original paint
– Painting of spare parts delivered unpainted
Previous tasks
Make sure that the following preconditions are met:
q The surface to be painted is clean and free of grease, dust, and debris.
q The spray paint can is at ambient temperature.
q All areas not to be painted are masked.
Consumables and equipment
Make sure that the following consumables and equipment are available:
– Spray paint can - black color (12692707)
– Rags
– Cleaner
Painting
u Shake the spray paint can for 3 minutes.
u Spray the paint at a distance of 25 cm (9.84 in) to 30 cm (11.81 in), making a criss-cross
pattern.
u Spray enough layers to cover the whole unpainted area.
u Turn the spray can upside down and bleed the valve after finishing the paint work.
Information
In optimal conditions (20 °C (68 °F), 65% of humidity), the paint is completely dry after 24 hours.
5.5.3 Post-maintenance bleeding
Previous tasks
Make sure that the following preconditions are met:
q Maintenance activities are completed.
q Covers and guards are reinstalled.
q Lockout/tagout procedure is completed.
Specific safety advice
Not applicable.
102
(→ Lockout/tagout, p. 44)
© 2023 by Kohler Co. All rights reserved.
KD62V12A 33521061401_1_1 EN_US
2023-10