Step 36: Ladder Assembly
Part 4
G: Center the Ladder Assembly on the SW Wall. Ensure the bottom of the ladder is flush with the floorboards
and that the back of the ladder is tight to the SW Wall. Attach with 2 (S7). (fig. 36.6 and 36.7)
Fig. 36.6
Centred
Flush
Hardware
2 x
Pan Screw
S7
87
Fig. 36.7
Ladder Assembly
Swing Wall
S7
S7