Section 6

LED Test

To perform the Sensor Test, proceed as follows:
1. Remove electrical power from the DBV-500
Unit.
2. Set the DBV-500 DIP SW1 #4, 5, 6, 7 and #8 to
(Figure 6-77) and the DIP SW2 switches all
ON
to
(Figure 6-78).
OFF

Figure 6-77 LED Test DIP SW1 Setting

ON
1
2
3
Figure 6-77 LED Test DIP SW1 Setting

Figure 6-78 LED Test DIP SW2 Setting

ON
All
OFF
1
2
3
Figure 6-78 LED Test DIP SW2 Setting
3. Connect the Power Harness and apply electrical
power to the DBV-500 Unit. Then, confirm that
the LED lights at a Green gradient color.
4. Set the DBV-500 DIP SW1 #8 to
79) and confirm that the LED flashes at a Purple
color rate.

Figure 6-79 LED Test DIP SW1 #8 OFF

ON
1
2
3
Figure 6-79 LED Test DIP SW1 #8 OFF
5. Confirm that the LED flashes in the following
color sequence, Red
=> Yellow
=> Magenta
White
.
6. Set the DIP SW1 #8 to ON to end the test.
This completes the LED Test.
P/N 960-100933R_Rev. 2 {EDP #233449}
DBV™ Series DBV-500 Banknote Acceptor
4
5
6
7
8
4
5
6
7
8
(Figure 6-
OFF
4
5
6
7
8
=> Green
=> Blue
=> Cyan
=>

Other Performance Tests

To perform the other Performance Tests, proceed
as follows:
1. Remove electrical power from the DBV-500
Unit.
2. Set the DBV-500 DIP SW1 #8 to
80) and the DIP SW2 switches all to
6-81).

Figure 6-80 Other Tests DIP SW1 Setting

ON
1
2
3
Figure 6-80 Other Tests DIP SW1 Setting

Figure 6-81 Other Tests DIP SW2 Setting

ON
All
OFF
1
2
3
Figure 6-81 Other Tests DIP SW2 Setting
3. Connect the Power Harness and apply electrical
power to the DBV-500 Unit.
4. Select the desired Performance Test by setting
the DIP Switches as indicated in Table 6-3.
5. Set the DIP SW1 #8 to
NOTE: If any errors occur, refer to
Table A-4 "LED Flash Error Codes"
on page A-3.
6. Set the DIP SW1 #8 to ON to end the test (Figure
6-80).
© 2020 JAPAN CASH MACHINE CO., LTD.
6 - 1 6
Calibration and Testing
(Figure 6-
ON
(Figure
OFF
4
5
6
7
8
4
5
6
7
8
to start the test.
OFF