Installation
3. Secure the Door Lock A and the Door Lock B by
installing the single (1) 2.6x8 Phillips, Self-Tap-
ping, Binding Head Screw (Figure 2-10 a).
Figure 2-10 Plastic Latch Installation 2
Back
a
Figure 2-10 Plastic Latch Installation 2

Metal Lock Installation

To install the Metal Lock onto the DBV-500 Cash
Box, perform the following steps:
1. Install the Cylinder (Figure 2-11 a) from the front
side of the lock installation hole.
2. Install the Cylinder attachments (Figure 2-11
&
b
) and the Door Lock Tang (Figure 2-11 c)
2
from the inside of the lock installation hole while
confirming that the Cylinder direction is correct.
Figure 2-11 Metal Lock Installation 1
a
Figure 2-11 Metal Lock Installation 1
3. Secure the Cylinder and the Door Lock Tang by
installing the single (1) Screw provided with 
Cylinder (Figure 2-12 a).
Figure 2-12 Metal Lock Installation 2
Back
15.8 mm
a
Figure 2-12 Metal Lock Installation 2

Frame Lock Installation

To install the Frame Lock onto the DBV-500 Cash
Box, perform following the steps:
1. Insert the Cylinder (Figure 2-13 a) from the front
side of the lock installation hole.
P/N 960-100933R_Rev. 2 {EDP #233449}
DBV™ Series DBV-500 Banknote Acceptor
Front
b
1
c
b
2
b
1
Front
2 - 3
2. Install the Cylinder attachments (Figure 2-13
&
b
) and the Door Lock Tang (Figure 2-13 c)
2
from the inside of the lock installation hole while
confirming that the Cylinder direction is correct.
Figure 2-13 Frame Lock Installation 1
b
1
b
2
a
Figure 2-13 Frame Lock Installation 1
3. Secure the Cylinder and the Door Lock Tang by
installing the single (1) Screw provided with the
Cylinder (Figure 2-14 a).
Figure 2-14 Frame Lock Installation 2
a
Figure 2-14 Frame Lock Installation 2
4. Place the Frame Lock assembly on the rear side
of the Cash Box. Be sure that both sides of the
Frame Lock Tabs are inserted into the Tab holes
of the Cash Box (Figure 2-15).
Figure 2-15 Frame Lock Installation 3
Figure 2-15 Frame Lock Installation 3
© 2020 JAPAN CASH MACHINE CO., LTD.