Sensor Test; Acceptance Test; Figure 6-71 Sensor Test Dip Sw1 Setting; Figure 6-72 Sensor Test Dip Sw2 Setting - JCM GLOBAL DBV Series Operation And Maintenance Manual

Banknote acceptor
Hide thumbs Also See for DBV Series:
Table of Contents

Advertisement

Calibration and Testing

Sensor Test

To perform the Sensor Test, proceed as follows:
1. Remove electrical power from the DBV-500
Unit.
2. Set the DBV-500 DIP SW1 #7 and #8 to
(Figure 6-71) and the DIP SW2 switches all to
(Figure 6-72).
OFF

Figure 6-71 Sensor Test DIP SW1 Setting

ON
1
2
3
Figure 6-71 Sensor Test DIP SW1 Setting

Figure 6-72 Sensor Test DIP SW2 Setting

ON
All
OFF
1
2
3
Figure 6-72 Sensor Test DIP SW2 Setting
3. Connect the Power Harness and apply electrical
power to the DBV-500 Unit. Then, confirm that
the LED lights at a Green gradient color.
4. Set the DBV-500 DIP SW1 #8 to
73) and confirm that the LED flashes at a Purple
color rate.

Figure 6-73 Sensor Test DIP SW1 #8 OFF

ON
1
2
3
Figure 6-73 Sensor Test DIP SW1 #8 OFF
5. Block each Sensor and confirm the Bezel LED
color changes to the correct color for the Sensor
being tested according to Table 6-5.
Table 6-5 Sensor and LED Condition
Sensor Name
Except following condition
Entrance Sensor
Centering Sensor
Validation Sensor
Exit Sensor
Stacker Home
When the Pusher Plate is
Position Sensor
NOT at Home Position
When the Centering
Centering Home
Mechanism is NOT at Home
Position Sensor
Box Detection
When the Cash Box is
Sensor
*. If multiple sensors are active, the status of the sensor with lowest priority is
shown.
6. Set the DIP SW1 #8 to ON to end the test.
This completes the Sensor Test.
P/N 960-100933R_Rev. 2 {EDP #233449}
DBV™ Series DBV-500 Banknote Acceptor
ON
4
5
6
7
8
4
5
6
7
8
(Figure 6-
OFF
4
5
6
7
8
*
Condition
LED
OFF
Shielded
RED
Shielded
GREEN
Shielded
BLUE
Shielded
YELLOW
MAGENTA
CYAN
Position
WHITE
installed

Acceptance Test

To perform the Acceptance Test, proceed as
follows:
1. Remove electrical power from the DBV-500
Unit.
2. Set the DBV-500 DIP SW1 #1, #2, #3, #4 and #8
to
(Figure 6-74) and the DIP SW2 all
ON
switches to
OFF

Figure 6-74 Acceptance Test DIP SW1 Setting

ON
1
2
3
Figure 6-74 Acceptance Test DIP SW1 Setting

Figure 6-75 Acceptance Test DIP SW2 Setting

ON
All
OFF
1
2
3
Figure 6-75 Acceptance Test DIP SW2 Setting
3. Apply electrical power to the DBV-500 Unit and
confirm that the LED lights at a Green gradient
color.
4. Set the DBV-500 DIP SW1 #8 to
76) and confirm that the LED flashes at a Purple
color rate.

Figure 6-76 DIP SW1 #8 OFF

ON
1
2
3
Figure 6-76 DIP SW1 #8 OFF
5. Place the Cash Box onto the DBV-500 Unit.
6. Confirm that the DBV-500 performs an initializa-
tion and goes to idle, waiting for a Banknote
insertion. If errors occur, refer to Appendix A
Table A-1.
This completes the Acceptance Test.
© 2020 JAPAN CASH MACHINE CO., LTD.
6 - 1 5
Section 6
(Figure 6-75).
4
5
6
7
8
4
5
6
7
8
(Figure 6-
OFF
4
5
6
7
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbv-500

Table of Contents