Operational Flowchart (Continued 2) - JCM GLOBAL DBV Series Operation And Maintenance Manual

Banknote acceptor
Hide thumbs Also See for DBV Series:
Table of Contents

Advertisement

Installation

Operational Flowchart (Continued 2)

Figure 2-37 depicts a typical DBV-500 Stacking Banknote acceptance flow process.
Figure 2-37 DBV-500 Operational Flowchart
(Stacking)
B
a
b
NO
C
*2). When a "Cash Box Full" Signal is received, retrieve the Banknotes from the Cash Box and re-seat the Cash Box back into
the Unit. The DBV-500 Unit will automatically perform its re-initialization movement operation.
P/N 960-100933R_Rev. 2 {EDP #233449}
DBV™ Series DBV-500 Banknote Acceptor
YES
c
Figure 2-37 DBV-500 Operational Flowchart (Stacking)
B) From "Validation" Flow (Figure 2-36)
a) Stack the Banknote
b) Is the Cash Box full?
c) Stop operation (Stacker Full Signal Output)(*2)
C) To "Initializing" flow (Figure 2-35)
© 2020 JAPAN CASH MACHINE CO., LTD.
2 - 2 3
Section 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbv-500

Table of Contents