Installation; Installation Procedure; Grounding; Unit Installation - JCM GLOBAL DBV Series Operation And Maintenance Manual

Banknote acceptor
Hide thumbs Also See for DBV Series:
Table of Contents

Advertisement

2 INSTALLATION

This section provides installation and operating
instructions for the DBV
Banknote Acceptor Unit. The information within
this section contains the following features:

Installation Procedure

DIP Switch Configurations
Connector Pin Assignments
Preventive Maintenance
Cleaning Procedure
Standard Interface Schematics
Operational Flowchart
Installation Procedure
NOTE: For a SU stacker installation, invert
the following instructions.
NOTE: Make sure the DVV-500 Unit is
installed horizontally at 0 degrees on a flat
surface
NOTE: Securely tighten the DBV-500 Unit
mounting nuts to prevent loosening from
vibration.

Grounding

Perform the following steps to ground the DBV-
500 Unit:
1. Place the Toothed Washer (Figure 2-1 a), the
grounding cable (Figure 2-1 b) and the M4 Screw
with W Washer (Figure 2-1 c) on one of the
Frame Grounding points. (refer to "DBV-500
Installation/Maintenance Space Requirements"
on page 1-10 for the Frame Grounding points).
2. Tighten the M4 Screw with W Washer (Figure 2-
1 c).
Figure 2-1 Grounding
Cable Diameter: 1.6mm or larger
Screw: M4 Pan Head Screw with
W Washer 12mm or shorter
Figure 2-1 Grounding
P/N 960-100933R_Rev. 2 {EDP #233449}
DBV™ Series
DBV-500 Banknote Acceptor
S e c t i o n 2
Series DBV-500
Edge Side
Round Side
a
b
c

Unit Installation

The DBV-500 Frame Unit provides installation
grooves on its surface.
Caution: Use M4 12mm Threaded Studs
to avoid the damage when opening the
Upper Guide.

Standard Installation

1. Ground the DBV-500 Unit (refer to "Grounding"
on page 2-1).
2. Place the DBV-500 Unit Frame cut outs (Figure
2-2
a
through
a
1
the chassis.
Figure 2-2 Standard
86.4
Insertion Slot
Area (open)
86.4
86.4
NOTE: All dimensions in millimeters
Figure 2-2 Standard Unit Installation 1
3. From the rear side of the DBV-500 Frame, secure
the Unit with the four (4) Toothed Washers (Fig-
ure 2-3
a
through
1
b
through
b
).
1
4
Figure 2-3 Standard Unit Installation 2
Edge Side
Round Side
Figure 2-3 Standard Unit Installation 2
© 2020 JAPAN CASH MACHINE CO., LTD.
2 - 1
) on to the Threaded Studs on
4
Unit Frame Cut Outs
a
1
a
3
M4 12mm Threaded Studs (designated)
a
) and M4 Nuts (Figure 2-3
4
a
1
b
1
a
2
b
2
a
3
b
a
3
4
b
4
a
2
a
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbv-500

Table of Contents