Operational Flowchart (Continued 1) - JCM GLOBAL VEGA-RC Twin Series Integration Manual

Banknote recycler
Table of Contents

Advertisement

Operational Flowchart (Continued 1)

Figure 16 depicts part two of a typical VEGA-RC Twin™ Banknote recycling "Main" flow process.
P/N 960-000169R_Rev. A {EDP #217859}
VEGA-RC Twin™ Series Banknote Recycler Integration Guide
Figure 16 VEGA-RC Twin Operational Flowchart (Main)
A) From "Initializing" flow (See Figure 15)
a) Has "Dispense 2" command been received?
B) To "Dispensing 2" flow (See Figure 17)
b) Has "Dispense 1" command been received?
C) To "Dispensing 1" flow (See Figure 18)
c) Has "Retrieving" command been received?
D) To "Retrieving" flow (See Figure 17)
d) Has "Clearing Error" command been
received?
E) To "Clearing Error" flow (See Figure 20)
e) Has "Correcting Log" command been
received?
f) Sending log to host
E) To "Clearing Error" flow (See Figure 20)
F) To "Initializing" flow (See Figure 15)
© 2012, Japan CashMachine Co., Limited
1 4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents