Sungrow SG25CX-P2 User Manual page 64

Pv grid-connected inverter
Hide thumbs Also See for SG25CX-P2:
Table of Contents

Advertisement

5 Electrical Connection
Step 7 Connect OUT+ of the first optimizer and OUT- of the last optimizer to the PV input terminals
of the inverter.
If each PV module is equipped with an optimizer, the total power of PV modules in
a PV input shall not exceed the maximum input power of a single PV input of the
inverter.
Inverter
SG25/30/33/36/40/50CXP2
Branch-connector connection on the input side of the inverter is not supported
by the optimizer.
Please refer to the optimizer user manual for details.
54
Number of Optimizers Sup-
ported in a String
6~35
User Manual
Upper Limit of String Power
(kW)
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg30cx-p2Sg33cx-p2Sg36cx-p2Sg40cx-p2Sg50cx-p2

Table of Contents