Sign In
Upload
Manuals
Brands
Sungrow Manuals
Inverter
SG2500U-MV
Sungrow SG2500U-MV Solar Inverter Manuals
Manuals and User Guides for Sungrow SG2500U-MV Solar Inverter. We have
1
Sungrow SG2500U-MV Solar Inverter manual available for free PDF download: System Manual
Sungrow SG2500U-MV System Manual (103 pages)
MV Turnkey Station
Brand:
Sungrow
| Category:
Inverter
| Size: 3.66 MB
Table of Contents
Table of Contents
3
1 About this Manual
9
Preface
9
Validity
9
Content
9
Target Group
9
Symbols Explanation
10
How to Use this Manual
11
Terminology
11
2 Safety Instructions
12
Intended Usage
12
Important Safety Instructions
12
General Safety Rules
13
Manual Storage
13
PV Arrays Hazards
13
Ground Fault Protection
14
Live Line Measurement
14
Measuring Instrument
14
Volt-Free Operations
14
ESD Protection
15
LCD Parameter Setting
15
Sand and Moisture Protection
15
Symbols on the Device Body
15
Safety Warning Signs
15
Daily Operation and Maintenance
15
Disposal of Waste
16
Manual Description
16
Safety Instructions of each Working Area
16
Safe Operation of the MV Station Room
17
Safe Operation of the Transformer Room
17
3 Product Description
18
Brief Introduction
18
MV Station Internal Construction
18
Overall Design of the MV Station
19
MV Station Views
19
Mechanical Parameter
21
Ventilation Design
22
Interior Design of the MV Station
22
Internal Components
22
Cable Entry Design
23
Internal Devices of the MV Station
24
Operations on the DC Circuit Breakers
25
4 Identify and Store the MV Station
26
Identifying the MV Station
26
Checking for Transport Damages
26
Storage of the MV Station
26
5 Mechanical Installation
28
Transport
28
Hoisting the MV Station
29
Safety Precautions
29
Hoisting
30
Fastening of Connectors
31
Foundation
31
Selection of Installation Site
31
Foundation Requirements
31
Recommended Foundation Construction Plan
32
Other Precautions
34
Removing Flashings and Cover Plates
35
6 Electrical Installation
36
Safety Instructions
36
Generals Rules
36
Five Safety Rules
37
Parts for Cabling
38
Copper Wire Connection
38
Aluminum Wire Connection
39
Tightening Torques
39
Preparation before Electrical Connections
39
Installation Tools
40
Opening the MV Station Door
40
Removal of the Protective Grid
40
Removing Sealing Tapes of Cable Inlet Holes
40
Checking the Cables
40
During Connection
41
MV Station Circuit Diagram and Cable Connection
41
Circuit Diagram
41
Cable Specifications
41
General Principles for Cable Connections
42
DC Connection
42
Checking before Connection
42
DC Cable Connection
42
AC Connection
44
Safety Notices
44
AC Cable Connection
45
Ground Connection
45
Brief Introduction
45
Equipotential Connection of MV Station Internal Devices
45
External Grounding
46
Communication Connection
47
External Power Supply Connection
48
Finishing Electrical Connection
49
7 Commissioning
50
Safety Instructions
50
Requirements for Commissioning
50
Checking before Commissioning
51
Checking the Cable Connection
51
Checking the Module
51
Checking PV Array
51
Checking Grid Voltage
52
Preparation before Starting
52
Starting the Device
52
LCD Parameter Setting
53
Completing Commissioning
53
8 Starting/Stopping
55
Starting
55
Inspection before Starting
55
Starting Steps
55
Stopping
56
Normal Stop
56
MV Station Stops When a Fault Occurs
56
9 LCD Menu Operation
57
LCD Touch Screen
57
Default Screen
57
Initialization
57
Default Screen Introduction
57
Backlight and Screensaver
58
Overview of LCD Menu and Icon
58
Overview of Submenu and Icon
58
Layout of the Submenus
58
Entering Password
59
Language Setting
60
Conventional Way
60
Shortcut
60
Date and Time Setting
61
Running Information Checking
61
History Information Checking
62
History Event Checking
62
History Data Checking
63
History Fault Checking
63
History Alarm Checking
64
Present Fault Information Checking
64
Starting/Stopping
65
Load Default
65
Firmware Version Checking
65
Parameters of LCD
66
Communication Parameters
66
Running Parameters
67
Protection Parameter
69
1005 MV Station Functions
74
Operation Mode
74
Mode Change
74
Operation Mode Description
74
Complete Control Strategy
76
Active Power Limitation
76
Introduction to Active Power Limitation
76
How to Realize Power Limitation
76
Reactive Power Adjustment
77
L/Hvrt
78
Temperature Derating
79
Mppt
79
Intelligent Temperature-Control Technology
80
Insulation Monitoring Function
80
Introduction
80
Simple Troubleshooting
80
GFDI Function
81
Vs-U Curve
81
Protection Function
81
DC Over-Voltage Protection
81
AC Over/Under-Voltage Protection
81
Frequency Anomaly Protection
81
Islanding Protection
81
Reverse Polarity Protection
82
Overload Protection
82
Ground Protection
82
Module Over-Temperature Protection
82
Internal Over-Temperature Protection
82
Firefighting
82
General Introduction
82
Smoke Detector
82
11 Troubleshooting
84
Safety Instructions
84
Fault Checking
84
Fault and Troubleshooting on the LCD Screen
85
LCD Display Alarm Information and Troubleshooting
89
Other Faults
91
12 Routine Maintenance
92
Safety Instructions
92
Five Safety Rules
93
Maintenance
93
Introduction
93
Maintenance Interval
93
Filter Checking and Cleaning
95
Cleaning MV Station Air Inlet Window
96
Replacement of the Electrical Components
97
On-Site Painting Make-Up Measures
97
Replacement of the Electrical Components
101
13 Appendix
102
MV Station System Parameter
102
Input Data (DC Side)
102
Output Data (Grid Side)
102
Mechanical Parameters
102
System Data
102
Exclusion of Liability
103
Contact Information
103
Advertisement
Advertisement
Related Products
Sungrow SG2500-MV
Sungrow SG250K3
Sungrow SG250HX
Sungrow SG250HX-US
Sungrow SG2.5RS-S
Sungrow SG250HX-IN-20
Sungrow SG2500HV-30
Sungrow SG25CX-P2
Sungrow SG25CX-SA
Sungrow SG250HX-IN
Sungrow Categories
Inverter
Battery Charger
Data Loggers
Storage
Conference System
More Sungrow Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL