4 Mechanical Mounting
4.5.1 Bracket-Mounted Installation
Tool preparation
Name
Marker
Level
Hammer drill
Wrench
Material preparation
Name
Bolt
assembly
Steel u-
channel
Step 1 Mark and drill holes in one steel u-channel according to the dimensions shown in the figure
below. Two steel u-channels should be spaced 180 mm - 260 mm apart.
Step 2 Secure the mounting-bracket to the steel u-channel with bolts.
26
Specification
—
-
Bit: φ12
Inner diameter: 16mm
Quantity
2
2
Specification
Source
M10
Included in the delivery
scope
-
Not included in the delivery
scope
User Manual