Installing The Carrier Frames To The Cutting Units; Preparing The Cutting Units; Assembling The Carrier Frames For The Front Cutting Units - Toro Reelmaster 3100-D Operator's Manual

Traction unit
Hide thumbs Also See for Reelmaster 3100-D:
Table of Contents

Advertisement

Assembling the Lift Cylinder to the Right Lift Arm
(continued)
Some hydraulic fluid is forced out at the hose fittings when you move the lift-cylinder
rod.
5. Assemble the rod to the flanges with the mounting pin
rings
6. Apply No. 2 lithium grease to the grease fittings
cylinder.
7. Torque the swivel fittings of the return
lift hoses
8. Clean hydraulic fluid from the machine.
Installing the Carrier Frames to the Cutting
7
Units
Parts Required
3

Preparing the Cutting Units

1. Remove the cutting units from the cartons.
2. Adjust the cutting units as instructed in the Operator's Manual for the cutting units.
Assembling the Carrier Frames for the Front Cutting
Units
Cutting Unit with Links
Note:
The front carrier frames are part of the optional lift arm kit.
3466-297A
.
to 37 to 45 N∙m (27 to 33 ft-lb).
Cutting Unit (optional part—order separately)
IMPORTANT
of the lift arm and the hydraulic
and
G402574
Page 3–8
Setup: Installing the Carrier Frames to the Cutting Units
, 2 spacers
, and 2 snap

Advertisement

Table of Contents
loading

This manual is also suitable for:

0317003171

Table of Contents