Mount Carrier Frames To Cutting Units - Toro 03200 Reelmaster 3100-D Operator's Manual

Traction unit
Hide thumbs Also See for 03200 Reelmaster 3100-D:
Table of Contents

Advertisement

Figure 13
1. Lift arm
3. Secure pivot rods to lift arms with a 5/16 – 18 x 7/8" lg.
capscrew.
4. Insert R.H. & L.H. lift arms onto lift arm pivot shafts.
Secure with lift arm pivot shaft link and capscrews
previously removed. Torque capscrews to 70 ft–lbs.
5. Remove rear retaining rings securing mounting pins to
each end of lift cylinder.
1
4
6
5
Figure 14
1. Lift arm (R.H.)
2. Lift arm (L.H.)
3. Retaining ring
6. Secure right end of lift cylinder to right lift arm with pin
and (2) spacers. Secure with retaining ring.
1
2
2. Pivot rod
3
2
4
4. Mounting pin
5. Lift cylinder
6. Spacer (2)
2
1
1. Lift cylinder
2. Hoses
7. Secure left end of lift cylinder to left lift arm with pin.
Secure with retaining ring.
Note: With lift arms fully raised, hoses should be routed as
shown in figure 18 and clear lift arm by .04–.12".
Mount Carrier Frames To
Cutting Units
1. Remove cutting units from cartons. Adjust per Cutting
Unit Operator's Manual.
2. Position a front carrier frame (Fig. 16) onto each front
cutting unit. Align mounting holes with mounting links
as shown in figure 18.
1
1. Front carrier frame
17
3
Figure 15
3. Clearance here
Figure 16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

03200032200322103201

Table of Contents