Power Lift Winch Maintenance - Chore-Time REVOLUTION 8 Installation And Operator's Manual

Rooster feeder variable brood feeding system
Hide thumbs Also See for REVOLUTION 8:
Table of Contents

Advertisement

Maintenance
To reinstall the Anchor and Bearing Assembly:
1.Insert the Anchor Assembly into the auger until it touches the washer at the back of the anchor. Tighten the
setscrews in the center of the anchor until they touch the auger, then tighten a maximum of 1/2 turn. See Fig-
ure 84.
2.DO NOT OVERTIGHTEN THE SET SCREWS.
3.Carefully remove the locking pliers while holding onto the Anchor and Bearing Assembly and auger
securely.
Slowly ease the auger back into the tube. Use caution. If the auger is allowed to spring back, the bearing race
may crack.
Install the Bearing Retainer and fasten with a tube clamp. Keep the Bearing Retainer flush with the end of the
anchor for safety.

Power Lift Winch Maintenance

Refer to Figure 85.
Grease the winch every 6 months with 1 to 2 shots of common industrial or automotive grease.
DO NOT OVER GREASE THE WINCH.
Remove any feed build-up in the Safety Switch Boxes in the Control Units.
It may be necessary to periodically re-tighten the shocker cable. Be sure to disconnect power to the shocker before
servicing the equipment.
56
REVOLUTION® 8 Rooster Feeder Variable Brood Feeding System
Figure 84. Auger and anchor Bearing Connection
Grease the Power Lift Winch every 6 months
with one or two pumps of common industrial or
automotive grease. DO NOT over grease the
Power Lift Winch!
Figure 85. Maintenance to the Power Lift Winch
Lock Screws
MF1916B

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the REVOLUTION 8 and is the answer not in the manual?

Questions and answers

Table of Contents