REVOLUTION® 8 Rooster Feeder Variable Brood Feeding System

End Control and Boot Assembly Installation

The End Control Unit must be at least 10 feet [3 m] from the end of the building to allow birds access around the
end of the feeder line.
1.Assemble the End Control Unit to the Feeder Line Control Tube using a clamp/anti-roost bracket. See
Figure 63. DO NOT INSTALL THE POWER UNIT AT THIS TIME.
2.Install the Feeder Boot by sliding the straight end of the Feeder Boot into the belled end of the Feeder Tube.
Install a clamp/anti-roost bracket on the bell and tighten. The Feeder Boot must be level with the feeder line
and the open top of the Feeder Boot must be horizontal. See Figure 64. DO NOT INSTALL THE
ANCHOR BEARING AND BEARING RETAINER AT THIS TIME.
MF1916B
Figure 63. Connecting End Control Unit to the Feed Line Tube
Figure 64. Installing the Feeder Boot
End Control and Boot Assembly Installation
43

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the REVOLUTION 8 and is the answer not in the manual?

Questions and answers

Table of Contents