Sign In
Upload
Manuals
Brands
Chore-Time Manuals
Farm Equipment
REVOLUTION 8
Chore-Time REVOLUTION 8 Manuals
Manuals and User Guides for Chore-Time REVOLUTION 8. We have
2
Chore-Time REVOLUTION 8 manuals available for free PDF download: Installation And Operator's Manual
Chore-Time REVOLUTION 8 Installation And Operator's Manual (72 pages)
Rooster Feeder Variable Brood Feeding System
Brand:
Chore-Time
| Category:
Farm Equipment
| Size: 8.59 MB
Table of Contents
Chore-Time Warranty
2
Conditions and Limitations
3
Table of Contents
4
About this Manual
6
Safety Information
6
Safety Instructions
7
Follow Safety Instructions
7
Decal Descriptions
7
General
7
Information
7
Manufacturer's Recommendations: Birds Per Pan
8
Planning the Suspension System
9
General Installation Information
10
Laying out the Suspension System
10
Installing the Suspension System
11
Power Lift Winch Installation
11
Installing the Main Winch Cable
12
Screw Hook Installation
13
Ceiling Hook Installation
14
Drop Installation
15
Hopper Assembly Procedure
16
Assembly
16
Suspend the Hopper
16
Feeder Pan Assembly (Window Cone System)
18
Installing the Pivot Clip
20
Feeder Line Planning (Window Cone System)
21
ACCU-CLICK™ Actuator
21
Feeder Line Assembly and Suspension (Window Cone System)
23
ACCU-CLICK™ Actuator Installation
23
Feeder Pan and Tube Assembly Process
23
Assemble and Suspend the Feeder Line
24
Anti-Swing Installation
27
Actuator Installation (Window Cone Systems)
28
Installing Spring Brackets
28
Spring Bracket Installation for 9 Foot 4 Hole and 12 Foot 5 Hole Tubes
28
Installing Actuator Wire
30
Setting ACCU-CLICK™ Actuator
32
Feeder Pan Assembly (Indexing System)
33
Feeder Line Assembly & Suspension (Indexing System)
36
Feeder Pan and Tube Assembly Process
36
Assemble and Suspend the Feeder Line
36
Indexing the Feeder
38
Indexing Chart for Male Feeders
40
For Systems Using 9' (2.7 M) Auger Tube and 348 RPM Power Units
40
For Systems Using 10' (3 M) or 12' (3.6M) Auger Tube and 696 RPM Power Units
41
Anti-Swing Installation
42
End Control and Boot Assembly Installation
43
Auger Installation
44
Auger Brazing
47
Anti-Roost Installation
48
Electro-Guard Operation
50
Feeder Management and Operation
51
Initial Start-Up of the Feeding System
51
General Operation of the REVOLUTION® 8 Feeders
53
REVOLUTION® Rooster Feeder Operation Guide
53
End Control Pans
53
Maintenance
54
Floor Feeding System Maintenance
54
Gear Head Maintenance
54
SENSOR PLUS™ Sensor Switch Adjustment for Control Units
55
Feeder Line
55
Power Lift Winch Maintenance
56
Trouble Shooting the Floor Feeding System
57
Wiring Diagrams
58
Internal Wiring End Control
58
SENSOR PLUS™ Control Wiring Diagram
59
SENSOR PLUS™ Three Phase(Ø) Wiring
60
Parts Listing
61
150# Hopper Components
61
Single Boot Components Part No. 6822
62
Twin Boot Components Part No. 6824
63
Feeder Line Components
64
Power Unit Assemblies
65
Power Unit Assembly Part Numbers
65
Sensor Plus End Control
66
Part No. 48509 REVOLUTION® 8 END CONTROL
66
50361 ACCU-CLICK™ Rooster Feeder System
68
47687 Power Winch
69
Indexing Gauge
69
Miscellaneous Suspension Components
70
Feeder Components
71
Advertisement
Chore-Time REVOLUTION 8 Installation And Operator's Manual (64 pages)
Variable Brood Feeding System
Brand:
Chore-Time
| Category:
Farm Equipment
| Size: 8.88 MB
Table of Contents
Table of Contents
2
Warranty
4
About this Manual
5
Safety Information
5
Safety Instructions
6
Follow Safety Instructions
6
Decal Descriptions
6
General
6
Information
6
Manufacturer's Recommendations: Birds Per Pan
7
Planning the Suspension System
8
General Installation Information
9
Laying out the Suspension System
9
Installing the Suspension System
10
Power Lift Winch Installation
10
Installing the Main Winch Cable
11
Screw Hook Installation
12
Ceiling Hook Installation
13
Drop Installation
13
Hopper Assembly Procedure
15
Assembly
15
Suspend the Hopper
16
Feeder Pan Assembly
17
Installing the Pivot Clip
19
Feeder Line Planning
20
ACCU-CLICK™ Actuator
20
Feeder Line Assembly and Suspension
22
ACCU-CLICK™ Actuator Installation
22
Feeder Pan and Tube Assembly Process
22
Assemble and Suspend the Feeder Line
24
End Control and Boot Assembly Installation
26
Auger Installation
27
Auger Brazing
30
Actuator Installation
31
Installing Spring Brackets
31
Spring Bracket Installation for 9 Foot 4 Hole and 12 Foot 5 Hole Tubes
31
Spring Bracket Installation for 10 Foot 4 Hole and 12 Foot 5 Hole Tubes
31
Installing Actuator Wire
33
Setting ACCU-CLICK™ Actuator
35
MID-Line Control
36
Anti-Roost Installation
38
Electro-Guard Operation
40
Feeder Management and Operation
41
Initial Start-Up of the Feeding System
41
General Operation of the Rev. 8 and 12 Feeders
42
REVOLUTION® Feeding System Operation Guide
43
End Control and MID Line Control Pans
44
Controlling the Feeders (Optional Equipment)
44
Maintenance
45
Floor Feeding System Maintenance
45
Gear Head Maintenance
45
SENSOR PLUS™ Sensor Switch Adjustment for Control Units
46
Feeder Line
46
Power Lift Winch Maintenance
47
Trouble Shooting the Floor Feeding System
48
Wiring Diagrams
49
Internal Wiring End Control
49
SENSOR PLUS™ Control Wiring Diagram
49
SENSOR PLUS™ Three Phase(Ø) Wiring
50
MID Line Control Internal Wiring
51
Parts Listing
52
150# Hopper Components
52
Hopper Mount Bracket (Optional)
52
Single Boot Components Part No. 6822
53
Twin Boot Components Part No. 6824
54
Power Winch (Part No. 47687)
54
Feeder Line Components
55
Power Unit Assemblies
56
Power Unit Assembly Part Numbers
56
Sensor Plus End Control
58
Sensor Plus MID Line Control
60
50165 ACCU-CLICK™ System
61
Miscellaneous Suspension Components
62
Feeder Components
63
Advertisement
Related Products
Chore-Time REVOLUTION 12
Chore-Time REVOLUTION
Chore-Time Valego RDE-58
Chore-Time 40170
Chore-Time 55
Chore-Time 56471
Chore-Time 56471SS
Chore-Time 75
Chore-Time 75 Plus
Chore-Time 75 Stainless
Chore-Time Categories
Fan
Farm Equipment
Control Unit
Industrial Equipment
Controller
More Chore-Time Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL