1.2 Rough Pre-operation Procedure
The outline procedure before operating GOT is shown.
Install GT Designer2 or GT Designer3 in the PC.
Create project data.
Wire for the GOT power supply.
Connect GOT and PC with a RS-232/USB
conversion adaptor or RS-232 cable.
1) Install a communication driver on the GOT that
is compatible with the controller.
(The communication driver for the FX series is
factory-installed.)
2) Install the project data that were created with
GT Designer2 or GT Designer3 on the GOT.
Check the communication settings.
Connect the GOT and the destination connector.
Turn on the GOT power and the system of the
connection destination.
Start the monitor. (Display each screen.)
1 - 5
1.2 Rough Pre-operation Procedure
Start
End
Refer to GT Designer2 Version
Basic Operation/Data Transfer Manual.
Refer to GT Designer3 Version1
Screen Design Manual (Fundamentals)
Refer to GT Designer2 Version
Screen Design Manual.
Refer to GT Designer3 Version1
Screen Design Manual (Functions)
Refer to Chapter 7 WIRING.
Refer to Chapter 8 OPTION.
Refer to GT Designer2 Version
Basic Operation/Data Transfer Manual.
Refer to GT Designer3 Version1
Screen Design Manual (Fundamentals)
Refer to GOT1000 Series Connection Manual.