5. Loosen the top screw for the positive (+) with a Phillips-head
screwdriver. Refer to Figure 53.
Figure 53. Loosening the Screw for the Negative (+)
6. Wind the power wire and tighten the screw.Refer to Figure 54.
Figure 54. Tightening the Screw for the Negative (+)
7. After attaching the wires to the screws, verify that there are no
exposed wires or loose wire strands.
Warning
Check to see if there are any exposed copper strands coming from
the installed wires. When this installation is done correctly there
should be no exposed copper wire strands extending from the
terminal block. Any exposed wiring can conduct harmful levels of
electricity to persons touching the wires.  E12