Initial Rinse
(continued)
Thermo Scientific
4. Select the appropriate power cord, remove and install the two fuses
into the fuse draw in the power entry module. U.K. customers use
cord CRX100 and fuses for 240V installation.
5. Connect/attach to proper electrical outlet and the unit.
Warning Use a properly grounded electrical outlet of correct voltage and
current handling capacity.
6. Turn the unit on by turning the main power switch to the "I" (ON)
position.
7. The system greeting will display the type of unit you own. This
greeting is "UV/UF."
8. The system electronics will initialize and check its calibration (all units
have been factory calibrated). If calibration is OK, the display will
show "Calibration (passed)." The display will next read "Self Test (in
progress) Self Test. Passed." Finally, the display will read "10 (±0.2)
MΩ-cm." This is a reading of the calibration reference value.
9. From the (Idle) mode, when the display reads, "Nanopure (Idle)
xx:xx:xx xx/xx/xx," press ENTER to run an air purge.
10. Unit will display, "Air Purge?" Press ENTER.
11. Upon completion of the air purge, complete the "System Cleaning
Procedure."
Caution Never dispense water without first installing hose barb provided in
parts bag or final filter supplied with cartridge pack.
s
Nanopure Life Science (UV/UF)
Section 7
Initial Operation
s
7-3