Bench Top Fixing With Screws; Fill The Pump With Oil; Connect To The Vacuum System; Figure 7 Bench Top Fixing With Straps - Edwards T-Station 300 Instruction Manual

Table of Contents

Advertisement

Figure 7 Bench top fixing with straps

1. Straps
1. Straps

4.4.2 Bench top fixing with screws

1.
Dismantle the 4 rubber feet.
2.
Copy holes from base plate on your bench.
3.
Drill 11 mm holes in your bench .
4.
Place the pumping system on supplied spacers.
5.
Tighten the system by your own high tensile screws of appropriate length.

4.5 Fill the pump with oil

If the pumping system uses an E2M1.5 rotary vane pump, it must be filled with the
correct quantity of oil (supplied) before operating the equipment. For further
information refer to the EM Rotary Vane Pump manual A37132880.
Fill the pump with oil as follows:
1.
Remove the oil filler plug.
2.
Pour oil into the pump until the oil level just reaches the MAX mark on the bezel at
the top of the sight glass. If the oil level goes above the MAX mark, remove the
drain plug and drain the excess oil from the pump.
3.
After a few minutes, recheck the oil level. If the oil level is now below the MAX
mark, pour more oil into the pump.
4.
Refit the oil filler plug. Tighten the plug firmly by hand. Do not over tighten.

4.6 Connect to the vacuum system

WARNING: POWER SUPPLY TO PUMP
Risk of injury or damage to equipment. Connect the turbo pump inlet to the vacuum
system before applying power to the pumping system. This will ensure that the pump
cannot operate accidentally causing injury.
D39595880_A
D39595880_A - Installation
Page 20
10/2020 - ©Edwards Limited

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-station next300d iso100T-station next300d cf100

Table of Contents