Furuno FCV-600 Installation Manual page 18

Hide thumbs Also See for FCV-600:
Table of Contents

Advertisement

1. MOUNTING
2. Decide the most suitable site from the selected locations by doing the following:
1) Refer to section 2.1 for connecting the power cable and transducer cable to
the main unit.
2) Put the transducer into a water-filled plastic bag. Press the transducer against
the chosen site.
3) Press the
4) See section 3.1 and select the desired transducer model.
5) Press the MENU/ESC key to open the main menu.
6) Select [Sounder] and press the KNOB.
7) Select [TX Power] and press the KNOB.
8) Select [1] and press the KNOB.
9) Press the MENU/ESC key twice to close the menu.
10) Check if the bottom echo appears on the display. If it doesn't, do this proce-
dure until a suitable location is found.
11) After the mounting location is decided, turn off the power of the unit.
3. Remove the transducer from the plastic bag and wipe the face of transducer with
a cloth to remove water and any foreign material. Lightly roughen the face of trans-
ducer with #100 sandpaper. Also, use the sandpaper to roughen the inside of the
hull where the transducer is to be mounted.
4. Wipe off any sandpaper dust from the face of the transducer.
5. Dry the face of the transducer and the hull. Coat the transducer face and mounting
location with marine sealant. Hardening begins in approx. 15-20 minutes so do
this step without delay.
Plastic bag
Hull plate
/BRILL key to turn on the main unit.
Transducer
13
Water
Marine
sealant

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fcv-800

Table of Contents