Furuno FCV-600 Installation Manual page 12

Hide thumbs Also See for FCV-600:
Table of Contents

Advertisement

1. MOUNTING
For FCV-800
The below flush mount kit is required when flush mounting the main unit.
1. Use the template (supplied) and cut out a hole in the mounting location.
2. Drill four holes for the binding screws at the mounting location.
3. See page 4 to unfasten the two knobs on either side of the main unit to separate
the main unit and a hanger. The knobs and hanger can be disposed.
4. Attach the Sponge V and H for Mount F (four in total, supplied) in order at the back
of the main unit (see the figure below).
Note 1: Work on a soft cloth to avoid damaging the unit.
Note 2: Attach the sponge so that it does not block the screw holes.
Note 3: Make sure not leave any gap between sponge V and H when attaching.
5. See section 2.1 to connect the required cables to the back of the main unit.
6. Fasten the main unit with connected cables to the mounting location.
7. Remove the four screw covers on the each corner of the main unit.
Kit details: OP02-88, Code No.: 001-638-240
Name
Mounting template (for both FCV-600
and FCV-800 (double-sided printing))
Sponge V for F mount
Sponge H for F mount
Binding screw
7
Qty
1
2
2
4
,
Sponge H for Mount F
,
Sponge V for Mount F
Screw cover

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fcv-800

Table of Contents