DC Charger

Checklist

The list of tasks detailed below should be carried out annually. The time of each task is an estimate.
1
Environmental condition – Visual check.
2
Enclosure state – Visual check.
3
Make sure the equipment can be accessed remotely - connection to the PC if it exists.
4
Display operation - visual and manual check.
5
Ventilation system and absence of vibrations - visual and auditory check.
6
Charge connector operation - visual and manual check.
7
Charge test recommended (optional).
8
Operation of the differential switch - Visual and manual check (optional).
The following tasks must be performed with the equipment completely off (no voltage at all, stopped, uncharged
and isolated):
1
Internal cleaning.
2
Filters - visual check and replacement.
3
Doors condition.
4
Cables and conductors - visual and manual check.
5
External and internal tightening torques - manual check.
6
Control circuit and protections - manual check.
Ford Pro contact info: chargingsupport@fordpro.com and 1-800-34-FLEET
MAINTENANCE
GLOBAL OPERATION TIME
STATUS 1
STATUS 2
NB 120 Installation Manual
TIME
1 h and 55 min
TIME
OK
(MINUTES)
5
5
5
5
5
5
10
5
TIME
OK
(MINUTES)
15
15
10
10
10
10
55