The following image shows an example of lifting the equipment with slings:
Removal of the lifting tools
Once the equipment has been anchored, the lifting tool must be removed by following these steps:
1.
Open the two side doors of the equipment
2.
Once both doors are open, remove both lifting tools by unscrewing the three M6 screws of each one.
3.
Close the doors again by following the reverse procedure.
NOTICE
If the methods described here cannot be applied, please contact the manufacturer.
It is the installer's responsibility to ensure unhindered access of vehicles to the final site or location,
considering their movement and handling at the unloading site.
It is important to keep the equipment in the packaging and place them as close as possible to the final location
for installation.
Ensure that loading/lifting equipment has a greater capacity than the weight of the equipment plus the auxiliary
elements and the loading/lifting task is carried out in a way that ensures the stability of the equipment.
1
For more information about the opening equipment doors, refer to the "Access" section.
Ford Pro contact info: chargingsupport@fordpro.com and 1-800-34-FLEET
1
.
NB 120 Installation Manual
24
EN

Advertisement

Table of Contents
loading

Table of Contents