Ford PRO NB 120 Series Installation Manual page 25

Dc charging station
Table of Contents

Advertisement

DC Charger
NB 120 Installation Manual
The equipment fixed on the pallet is ready to be handled by forklift truck and be transported by truck or container.
Keep in mind the load distribution and center of gravity.
For sea freight, the equipment is packed assembled vertically, in a cardboard box and fixed on a pallet base
with screws at four steel brackets. Externally, the box is strapped and shrink-wrapped.
In case of air shipment, the charger is shipped lying down in a wooden box and fixed on a pallet base using
screws and four steel brackets, as shown in the following picture. Use an electric screwdriver to remove the
M10 bolts that hold the brackets.
EN
Once the brackets have been removed, lift the equipment on the pallet taking care that the foot is properly
supported, and place it vertically to avoid possible damages caused by friction with the ground.
For handling and lifting the charger, it is equipped with four rings at the top. The image below (top view) shows
the location of the four lifting points.
DIMENSIONS
A
B
mm
383
150
in.
15.08
5.9
CAUTION
Be aware of all caution and warning messages before lifting the equipment.
To lift the equipment, a sling or a chain must be attached to each ring and securely fastened to the crane.
23
Ford Pro contact info: chargingsupport@fordpro.com and 1-800-34-FLEET

Advertisement

Table of Contents
loading

Table of Contents