Download Print this page

Heartland VALUE Series Assembly Manual page 74

Hide thumbs Also See for VALUE Series:

Advertisement

• You will finish off the top of the roof with a ridge cap made from shingles.
BEGIN
1
Cut shingles into THREE pieces.
2"
(5 cm)
Weather Seal
Install first ridge cap flush to shingles at front, as shown.
2
3
Install second ridge cap 5" back, as shown.
SHINGLES - RIDGE CAP
Hint: Use cut-off pieces first.
2"
(5 cm)
2"
2"
(5 cm)
(5 cm)
Flush
5"
12,7 cm
FRONT OF
SHED
2"
(5 cm
Top of slot.
Note: • You will need about 36 cut pieces.
(1) Nail per side through weather seal.
FRONT OF
SHED
(1) Nail per side through weather seal.
Flush
72
2"
(5 cm)
Score shingle,
then snap-off angled cut.
Pieces
36

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stratford