Download Print this page

Heartland VALUE Series Assembly Manual page 19

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x1
x1
RK
2 x 3 x 13" (5 x 7,6 x 33 cm)
x1
KZ
x2
PT
Arrange KZ and PT on flat on floor, as shown.
Place panel on KZ and PT with primed side up.
Install KZ first, measuring 1" (2,5 cm) from panel bottom.
2
Secure KZ with 1-1/2" (only) nails 6" apart.
Place PT flush to KZ and edge of panel. Hold the 33-1/2" (85 cm) measurement.
3
Secure with 1-1/2" nails spaced 12" apart.
Primed side
up
Flush
33-1/2"
(85 cm)
temporary support
LEFT WALL
LEFT WALL
REAR ASSEMBLY
2 x 3 x 32-1/2" (5 x 10 x 83 cm)
12"
(30 cm)
RK
2 x 3 x 96" (5 x 7,6 x 244 cm)
temporary support
Use only 1-1/2"
(3,8 cm) long nails
2-1/2" (6,4 cm)
Flush
6"
(15 cm)
(85 cm)
KZ
1-1/4"
(3,2 cm)
1"
(2,5 cm)
2-1/2"
(5,4 cm)
17
x12
1-1/2" (3,8 cm)
PT
PT
33-1/2"

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stratford