Download Print this page

Heartland VALUE Series Assembly Manual page 13

Hide thumbs Also See for VALUE Series:

Advertisement

Before attaching floor decking, it is important to level and square the floor frame.
A level and square floor frame is required to correctly construct your shed.
See page 8 for the preferred floor leveling method.
Use level and check the frame is level before applying floor panels.
2
Check for frame squareness by measuring diagonally across corners. If the measurements are the
3
same, the frame is square. The diagonal measurement will be approximately 170-9/16" (433,3 cm).
4
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at
ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one
fastener at ends of each runner making sure the frame remains square (Fig. A).
FINISH
Once the floor frame is level and square fasten the frame to the x4 runners at each point
where the frame contacts the 4x4 runners.
First, secure
at ends with
one fastener.
LEVEL AND SQUARE FLOOR FRAME
170-9/16"
(433,3 cm)
Fig. A
170-9/16"
(433,3 cm)
11
Second,
secure
at ends with
one fastener.

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stratford