Download Print this page

Heartland VALUE Series Assembly Manual page 21

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x1
x2
RK
2 x 3 x 13" (5 x 7,6 x 33 cm)
9
Place panel onto frame with the primed side up.
Secure with 1-1/2" nails spaced 6" apart on edges and 12" apart inside panel.
Secure RK with (3) 1-1/2" nails (Fig. A).
FINISH
Your left wall in now completed.
Proceed to build your right wall.
Fig. A
2-3/4"
1-1/2"
(7 cm)
(3,8 cm)
LEFT WALL
LEFT WALL
FRONT ASSEMBLY
2-1/2"
(6,4 cm)
RK
1"
(2,5 cm)
1"
(2,5 cm)
Flush
1"
(2,5 cm)
19
x33
1-1/2" (3,8 cm)
Primed side
up
Use only 1-1/2"
(3,8 cm) long nails
Flush
58-1/4"
(148 cm)
33-1/2"
(85 cm)
RK
2-3/4"
1-1/2"
(7 cm)
(3,8 cm)

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stratford