PARTS REQUIRED:
BEGIN
Center right wall on floor, side-to-side.
1
Nail the lower back wall corner to the right wall trim.
Secure with (1) 2" nail (Fig. A).
2
Be sure the measurement between the panel
edge and the trim is the same along the
entire length. Then secure with (1) 2" nail in
the upper corner (Fig. B).
Nail along the panel edge into the trim using
2" nails spaced 6" apart.
Nail along bottom of panel using 2" nails
spaced 6" apart.
Angle nail into floor frame
(Fig. C).
Nail down RK using (3) 3" nails on each
3
as shown and secure center wall frame
using (2) 3" screws (Fig. D).
Screw through the right wall trim into the
top and bottom plates using
3" screws (Fig. E, Fig. F).
FINISH
You have finished standing your right wall. Proceed to stand the front wall.
RIGHT WALL INSTALLATION
x31
2" (5 cm)
x6
3" (7,6 cm)
x4
Fig. C
(2)
3" (7,6 cm)
Screws
Fig. D
3" (7,6 cm)
CENTER
6"
(15 cm)
RK
35
Trim
Fig. A
Fig. B
Trim
Same
Measurement
6"
(15 cm)
3" (7,6 cm)
Screw
Trim
Fig. E
3" (7,6 cm)
Screw
3" (7,6 cm)
nails
Fig. F
2" (5 cm)
Nail
Back
Panel
2" (5 cm)
Nail

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stratford