Download Print this page

Heartland VALUE Series Assembly Manual page 71

Hide thumbs Also See for VALUE Series:

Advertisement

• Follow directions provided by manufacturer and these instructions.
Familiarize yourself with a 3-Tab Shingle.
Half A Rain Slot
BEGIN
Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
1
Starter row must be straight and level all the way across with lower edge of roof deck.
NOTE: If you have installed drip edge install shingles flush to drip edge.
FRONT OF
SHED
Shingle overlaps
roof decking.
SHINGLES
- NOT INCLUDED -
Notch
SHINGLE NAIL PATTERN
1"
(1,3 cm)
(2,5 cm)
Full Rain Slot
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
(4) Nails
Notch
1/2"
Sealing Strip
NAILS
TABS UP
1" (2,5 cm) overhang
past roof deck.
69
1"
(2,5 cm)
BACK OF SHED
1" (2,5 cm) overhang or
fush with drip edge.

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stratford