Download Print this page

Heartland VALUE Series Assembly Manual page 66

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x6
CYZ
x4
KV
5/8 x 3 x 8" (1,6 x 7,6 x 20 cm)
Position parts primed side-down on floor, as shown.
You will build (2) shutters the same.
2
Secure with 1" (25 mm) screws as shown.
Repeat steps to build your second shutter.
3
FINISH
You have finished building your window shutters. Proceed to install your window.
Flush
1/4"
(0,6 cm)
5/8 x 3 x 24-3/4" (1,6 x 7,6 x 62,9 cm)
KV x2
3-1/2"
(8,9 cm)
SHUTTERS
Primed side
down
Flush
both sides
64
x12
1" (25 mm)
CYZ x3
3-1/2"
(8,9 cm)
Flush
both sides
Install with primed
side facing down

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stratford