IDEC SmartAXIS FT9Z-1A01 User Manual page 308

Table of Contents

Advertisement

12: R
I / O
EM OTE
Using Saved Remote I/O Slave Settings
Operation procedure
In the Remote I/O Slave Configuration dialog box, click Open.
1.
The Open dialog box is displayed.
Select the configuration file (*.frs) to use and click Open.
2.
The remote I/O slave settings are loaded.
Notes:
When the remote I/O slave settings are read, the existing settings in the dialog box are overwritten.
If you specify an invalid file, an error message is displayed and the remote I/O slave settings are not loaded.
12-14
S
A XI S P
/ L
U
'
M AR T
R O
I TE
SER
S
M
FT9Y-B 1378
ANUAL

Advertisement

Table of Contents
loading

Table of Contents