Chapter 6. Maintenance; Maintenance Schedule - Watts Aerco Innovation 800 User Manual

Gas-fired hot water boilers
Table of Contents

Advertisement

Innovation Hot Water Hot Water Boiler User Manual

6.1 MAINTENANCE SCHEDULE

The Innovation Hot Water Boiler requires regular routine maintenance to ensure continued
reliable operation throughout the service life of the unit. For optimum operation, AERCO
recommends that the following routine maintenance procedures be performed in the time periods
specified in Table 6-1.
Appendix I contains a list of the recommended spare parts for maintenance of the Innovation
Heater.
TO AVOID PERSONAL INJURY, PRIOR TO SERVICING ENSURE THAT
THE FOLLOWING GUIDELINES ARE STRICTLY OBSERVED:
DISCONNECT THE AC SUPPLY BY TURNING OFF THE SERVICE
SWITCH AND AC SUPPLY CIRCUIT BREAKER.
SHUT OFF THE GAS SUPPLY AT THE MANUAL SHUT-OFF VALVE
PROVIDED WITH THE UNIT
ALLOW THE UNIT TO COOL TO A SAFE WATER TEMPERATURE TO
PREVENT BURNING OR SCALDING
Section
Igniter-Injector
6.2
(Kit P/N 58023)
Flame Detector
6.3
(Kit P/N 24356-2)
6.4
Combustion Calibration
6.5
Testing of Safety Devices
6.6
Fireside Inspection
6.7
Waterside Inspection
6.8
Heat Exchanger Cleaning
6.9
Condensate Drain Trap
Air Filter
6.10
(P/N 59138)
Low Water Cutoff (LWCO)
6.13
Probe Capacitor (Kit P/N
69126)
*
Only performed after initial 6 month period after initial startup.
OMM-0120_0A
GF-128-I
CHAPTER 6 – MAINTENANCE

CHAPTER 6. MAINTENANCE

--WARNING! -
Table 6-1 - Maintenance Schedule
Item
6 Mos.
*Inspect
*Inspect
*Check
*Inspect
*Inspect
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Phone: 800-526-0288
12 Mos.
Inspect
Inspect
Check
Test
Inspect & Clean
(as required)
Inspect & Clean
Clean or
Replace
-
Test
- INTERNATIONAL
Labor
24 Mos.
Time
15 min.
Replace
15 min.
Replace
1 hr.
20 min.
Inspect &
2 hrs.
Clean
1 hr.
Inspect
2 hrs.
-
30 min.
-
5 min.
-
Replace &
15 min.
Test
Page 71 of 174
11/15/2016

Advertisement

Table of Contents
loading

Table of Contents