Modulex EXT Series Piping Application Guide MANDATORY REQUIREMENTS SECTION 1: MANDATORY REQUIREMENTS The following actions are mandatory to ensure proper piping and drainage of the Modulex EXT system. CAUTION! Local codes and authorities must be consulted prior to installation. • AERCO requires that the boiler loop to be de-coupled from the system loop.
Page 4
Modulex EXT Series Piping Application Guide MANDATORY REQUIREMENTS RELIEF VALVE DISCHARGE PIPING RELIEF VALVE PIPED TO POINT OF DISCHARGE Figure 1: Relief Valve Point of Discharge Example AERCO International, Inc. • 100 Oritani Dr. Page 4 of 37 Blauvelt, NY 10913 TAG-0099 Phone: 800-526-0288 10.07.2010...
Modulex EXT Series Piping Application Guide BOILER QUALITY AND MAINTENANCE SECTION 2: BOILER QUALITY AND MAINTENANCE 2.1. BOILER WATER CHEMISTRY 2.1.1. Reaction of Metals to Water Chemistry A neutral water pH must be maintained because, although the aluminum alloys used in the construction of Modulex EXT boilers resist acidic conditions, they are still vulnerable to highly alkaline environments (pH of 9.0 and above).
Modulex EXT Series Piping Application Guide BOILER QUALITY AND MAINTENANCE cause harm to the boiler, pumps, piping, and other components of the hydronic boiler system. 2.2. TESTING AND MAINTENANCE OF WATER QUALITY Water in the installation should be checked, monitored, and treated for the following: •...
Modulex EXT Series Piping Application Guide BOILER QUALITY AND MAINTENANCE 2.3. SYSTEM FLUSHING, TREATMENT, AND CLEANSING Note that prior to cleaning the heating system, the boiler MUST be isolated from the piping to prevent infusion of containments, including sludge, into the boiler. Section 2.3 provides recommendations for flushing, cleaning, and treating the water used in the Modulex EXT boiler system.
Modulex EXT Series Piping Application Guide BOILER QUALITY AND MAINTENANCE • A reliable test to determine if a system is clean is if the Total Dissolved Solids (TDS) of the water being drained is within 10% of the make-up water TDS. This indicates that sufficient contamination has been flushed from the system.
Page 9
Modulex EXT Series Piping Application Guide BOILER QUALITY AND MAINTENANCE Fernox H-O-H Water Technology, Inc. Hydronic Agencies Ltd. Steve Sadowski Sean Leonard Greendale, WI Edmonton, AB, CANADA Phone: (414) 421-2070, Phone: (780) 452-8661 Toll Free: (800) 944-9746 Toll Free: (877) FERNOX4U Fax: (414) 421-2077 (877-337-6694) ssadowski@hohwatertechnology.com...
Modulex EXT Series Piping Application Guide BOILER LOOP DESIGN GUIDELINES SECTION 3: BOILER LOOP DESIGN GUIDELINES For proper and safe operation of the water tube Modulex boiler, the primary (boiler) loop piping and the associated fittings and accessories must be designed/selected as discussed in the following sections. Table 1 shows the required minimum flow rates at various system designed temperature rises.
Page 11
Modulex EXT Series Piping Application Guide BOILER LOOP DESIGN GUIDELINES ∆ TABLE 1.2: Light Commercial: 40 F T Water Flow 40°F ΔT Water Flow EXT 450 2S EXT 600 2S EXT 800 2S EXT 1100 2S Water Flow @ 40°F ΔT G = Gallons per Min Water Pressure Drop (Ft.
Modulex EXT Series Piping Application Guide BOILER LOOP DESIGN GUIDELINES ∆ TABLE 1.4: Light Commercial: 20 F T Water Flow 20°F ΔT Water Flow EXT 450 2S EXT 600 2S EXT 800 2S EXT 1100 2S Water Flow (GPM) @ Min. ΔT of 20°F Water Pressure Drop (Ft.
Page 13
Modulex EXT Series Piping Application Guide BOILER LOOP DESIGN GUIDELINES ∆ TABLE 2.2: Commercial: 40 F T Water Flow 40°F ΔT Water Flow EXT 1500 2S EXT 2300 2S EXT 2600 2S EXT 3000 2S Water Flow (GPM) @ Max. ΔT of 40°F Water Pressure Drop (Ft.
Page 14
Modulex EXT Series Piping Application Guide BOILER LOOP DESIGN GUIDELINES ∆ TABLE 2.4: Commercial: 25 F T Water Flow 25°F ΔT Water Flow EXT 1500 2S EXT 2300 2S EXT 2600 2S EXT 3000 2S Water Flow (GPM) @ Max. ΔT of 25°F Water Pressure Drop (Ft.
Modulex EXT Series Piping Application Guide BOILER LOOP DESIGN GUIDELINES 3.3. PRIMARY PUMP The primary pump shall have a discharge pressure able to assure the designed water flow rate, taking into account pressure drop losses as shown in Figure 2. When selecting a pump, take into account the pressure drop across the boiler, fittings, accessories and piping.
Modulex EXT Series Piping Application Guide BOILER LOOP DESIGN GUIDELINES Figure 3: Electrical Connection of Primary Pump WARNING! There is 120 VAC between terminals Y4-1 and Y4-2 whenever the boiler is ON. 3.4. STRAINERS AERCO requires the installation of a Y strainer to keep dirt out of the system and boiler. The strainer should be installed in the return piping with isolation valves to allow for cleaning as necessary.
Modulex EXT Series Piping Application Guide BOILER LOOP DESIGN GUIDELINES 3.6. AIR VENTING OF THE HEATING SYSTEM The Modulex boiler comes standard with an automatic air vent inside the boiler (see Figure 4a and 4b). This vent is for the boiler only and not the entire heating system. An effective air vent for air removal for the entire heating system must be installed in the highest point of the system piping.
Page 18
Modulex EXT Series Piping Application Guide BOILER LOOP DESIGN GUIDELINES Figure 4b: MODULEX EXT Main Components (Left Side View) (EXT 1500 2S - 3000 2S) AERCO International, Inc. • 100 Oritani Dr. Page 18 of 37 Blauvelt, NY 10913 TAG-0099 Phone: 800-526-0288 10.07.2010...
Modulex EXT Series Piping Application Guide CSD-1 MANIFOLD ASSEMBLY (SUPPLIED) SECTION 4: CSD-1 MANIFOLD ASSEMBLY (SUPPLIED) The installation of a flow switch, pressure/temperature gauge, and an ASME compliant safety pressure relief valve designed for the boiler output capacity is required. These major components are supplied with the boiler and must be assembled and wired when installing the boiler at the site.
Modulex EXT Series Piping Application Guide CSD-1 MANIFOLD ASSEMBLY (SUPPLIED) The pressure relief valve and all other manifold components are shown in Figures 5 and 6. 3/4” Pressure Flow Switch Relief Valve Pressure/Temperature Gauge Figure 6: Manifold Assembly and Components for EXT 450 2S, 600 2S, 800 2S & 1100 2S Flow Switch 1-1/2”...
Page 21
Modulex EXT Series Piping Application Guide CSD-1 MANIFOLD ASSEMBLY (SUPPLIED) 3. Connect the following components to the tapped holes in the manifold assembly (Fig. 6 & 7): • 3/4” Pressure Relief Valve • Flow Switch • Pressure/Temperature Gauge NOTE: Ensure that the flow switch is installed with the “flow” arrow pointing in the direction of the flow. 4.
Modulex EXT Series Piping Application Guide CONNECTING SUPPLY & RETURN PIPING SECTION 5: CONNECTING SUPPLY & RETURN PIPING 5.1. BOILER CONNECTIONS Upon delivery, the various models of Modulex EXT boilers are configured with connections for water, gas, air intake, and flue exhaust. Note that references to right-hand or left-hand orientation refer to the right- hand or left-hand side when viewed facing the front of the boiler.
Modulex EXT Series Piping Application Guide CONNECTING SUPPLY & RETURN PIPING FRONT VIEW LEFT-SIDE CONNECTIONS RIGHT-HAND CONNECTIONS AIR INLET WATER FLOW WATER FLOW GAS SUPPLY GAS SUPPLY WATER RETURN WATER RETURN EXHAUST OUTLET EXHAUST (DELIVERY OUTLET POSITION) RIGHT-SIDE VIEW LEFT-SIDE VIEW FOR EXT MODELS: EXHAUST •...
Modulex EXT Series Piping Application Guide CONNECTING SUPPLY & RETURN PIPING 5.4.3. Reversing Gas Manifold Connections (EXT 450 2S - 1100 2S) To move the gas connection from the RIGHT-HAND (standard) side to the LEFT-HAND side, swap the end plate and the gas supply connector screwed onto the gas manifold ends as shown. Ensure that the gaskets for ALL connections are reversed along with the connectors themselves.
Page 25
Modulex EXT Series Piping Application Guide CONNECTING SUPPLY & RETURN PIPING Refer to Figure 10 and reverse the connectors and end caps on Supply, Flow, and Return pipes. Ensure that all gaskets are also reversed. Reverse positions of Boiler Sensor KF and Automatic Move end caps (and Air Vent.
Modulex EXT Series Piping Application Guide CONNECTING SUPPLY & RETURN PIPING 5.4.5. Reversing Flow & Return Temperature Sensors One sensor is located on top of the lower Return pipe railing, while the other one is located under the upper Flow pipe railing. Move these two sensors to other end of the Flow/Return pipes. C.H.
Modulex EXT Series Piping Application Guide SYSTEM FILLING AND DRAINING NOTE: When reversing hydraulic and gas pipe connections, you must close up the chassis openings vacated after the change. See Figure 13. Figure 13: Caps and Plugs Used for Closing Up Vacated Gas and Hydraulic Connection Openings SECTION 6: SYSTEM FILLING AND DRAINING The boiler is equipped with its own drain (see Figures 4a and 4b for the drain position).
Modulex EXT Series Piping Application Guide CONDENSATE DRAIN SECTION 7: CONDENSATE DRAIN To maintain proper flow of condensate, the drain pipe must have a slope toward the drain of at least 3/8 in./ft. (30 mm/m). The liquid column inside the condensate siphon needs to be filled with water after installation.
Page 29
Modulex EXT Series Piping Application Guide CONDENSATE DRAIN ITEM # QTY. DESCRIPTION DN 40 PP Cap 95310512 DN 40 PP Elbow 95310513 DN 40 PP Tee 1 or 2 * 95310515 DN 40 PP Straight Pipe 1 ¼” PVC Joining Clamp 93087 (Optional, only if connecting to PVC instead of PP, not shown)