4.
The unit should perform two IGNITION RETRY cycles and then shut down on the third
successive ignition attempt. The unit will display AIRFLOW FAULT DURING PURGE.
5.
Re-enable the blower output drive voltage by performing the following steps:
Press the MENU key until CONFIGURATION MENU is displayed.
(a)
Press the ▲ arrow key until the ANALOG OUTPUT function is displayed, then
(b)
press the CHANGE key.
Press the ▲ arrow key until VALVE POSITION 0-10V is displayed, then press the
(c)
ENTER key.
6.
Once the unit has proved flame, turn off the blower by going to the Configuration Menu,
Analog Output menu item and select OFF.
7.
The Blower Proof switch will open and the blower should stop. The unit should shut down
and display AIRFLOW FAULT DURING RUN.
8.
Go to the Configuration Menu, Analog Output item and select VALVE POSITION 0-10V.
9.
Press the CLEAR button. The unit should restart.
10.
Next, check the operation of the Blocked Inlet switch located on the inlet side of the
Air/Fuel Valve (Figure 5-4).
11.
Ensure that the sheet metal panels are securely installed on the hot water boiler and the
unit is running.
12.
At the rear of the unit, partially block the air inlet (Figure 5-5) with a plywood sheet or
metal plate.
13.
The unit should shut down and again display AIRFLOW FAULT DURING RUN.
14.
Unblock the air inlet and press the CLEAR button. The unit should restart.
AIR/FUEL
VALVE
Figure 5-4. Blower Proof & Blocked Inlet Switch Locations
OMM-0120_0A
GF-128-I
CHAPTER 5 – SAFETY DEVICE TESTING
Air Flow Fault Tests – Continued
PARTIAL FRONT VIEW
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Phone: 800-526-0288
- INTERNATIONAL
BLOCKED
INLET SWITCH
BLOWER PROOF
SWITCH
BLOWER
Page 67 of 174
11/15/2016

Advertisement

Table of Contents
loading

Table of Contents