Prolonged Shutdown - Watts Aerco Innovation 800 User Manual

Gas-fired hot water boilers
Table of Contents

Advertisement

- INTERNATIONAL
Innovation Hot Water Hot Water Boiler User Manual
CHAPTER 1 – SAFETY PRECAUTIONS

1.3 PROLONGED SHUTDOWN

After prolonged shutdown, it is recommended that the startup procedures in Chapter 4 and the
safety device test procedures in Chapter 6 of this manual be performed to verify all system-
operating parameters. If there is an emergency, turn off the electrical power supply to the
AERCO heater and close the manual gas valve located upstream of the unit. The installer must
identify the emergency shut-off device.
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
OMM-0120_0A
Page 13 of 174
Phone: 800-526-0288
GF-128-I
11/15/2016

Advertisement

Table of Contents
loading

Table of Contents