Watts Aerco Innovation 800 User Manual page 87

Gas-fired hot water boilers
Table of Contents

Advertisement

Innovation Hot Water Hot Water Boiler User Manual
LWCO Capacitor Electrical Short Test – Continued
2. Remove the Shell Harness Cable (male) connector from the P-5 (female) connector on the
rear panel of the C-More controller (see Figure 6-12).
Figure 6-12: Removing Shell Harness Cable from P5 Conn. on C-More Rear Panel
3. Using an ohmmeter, connect one ohmmeter probe to the LWCO capacitor terminal on the
unit shell as shown on left in Figure 6-13.
4. Connect the second ohmmeter probe to Pin #6 of Shell Harness Connector (removed
from the C-More controller) as shown on right in Figure 6-13.
st
Connect 1
Lead to LWCO
LWCO Probe Assembly
Figure 6-13: Connecting Ohmmeter between LWCO Probe & Shell Harness Cable
OMM-0120_0A
GF-128-I
CHAPTER 6 – MAINTENANCE
Unplug Shell
Harness Cable
P5 Connector
Ohmmeter
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Phone: 800-526-0288
- INTERNATIONAL
from
Connect 2
19-Pin Shell Harness Cable
nd
Lead to PIN #6
Connector
Page 87 of 174
11/15/2016

Advertisement

Table of Contents
loading

Table of Contents