Mazda Mazda6 Workshop Manual Supplement page 628

Hide thumbs Also See for Mazda6:
Table of Contents

Advertisement

Locknut Assembly Note
1. Align the mark on the center yoke and shaft, and
install the center yoke.
Tightening torque
137—177 N·m
{16.1—18.0 kgf·m, 116—130 ft·lbf}
Bearing Cup and Snap Ring Assembly Note
1. Apply the grease to the bearing rollers inside the
bearing cups.
2. Set the new spider to the yoke, and assemble the
new bearing cup as the snap ring groove comes
out.
3. Assemble the opposite bearing cup in the same.
4. Insert the bearing cup to the yoke as the snap
ring groove width of bearing cup widens most and
both grooves width are same.
Caution
• Use a snap ring that thickness is same
for both sides.
L–12
PROPELLER SHAFT
MARK
BEARING CUP
SPIDER
YOKE
A6E6110W005
A6J6110W016
A6E6110W010
A6E6110W011

Advertisement

Table of Contents
loading

Table of Contents