Verifying Switch Operation; Installing The Switch; Rack-Mounting; Figure 2.1 Installing The Rack Mount Brackets - Advantech EKI-9226G Series User Manual

6xrj45 + 20xsfp port full gigabit l2 managed switch
Table of Contents

Advertisement

2.4

Verifying Switch Operation

Before installing the device in a rack or on a wall, power on the switch to verify that
the switch passes the power-on self-test (POST). To connect the cabling to the power
source see "Power Supply Installation" on page 16.
At startup (POST), the System LED blinks green, while the remaining LEDs are a
solidy green. Once the switch passes POST self-test, the System LED turns green.
The other LEDs turn off and return to their operating status. If the switch fails POST,
the System LED switches to an amber state.
After a successful self-test, power down the switch and disconnect the power cabling.
The switch is now ready for installation on its final location.
2.5

Installing the Switch

2.5.1

Rack-Mounting

1.
Align the rack mount brackets with the holes on the switch.
2.
Secure the rack mount brackets with the provided screws.
3.
Align the switch with the posts on the rack cabinet.
4.
Secure the switch.
SY S
PW R1
EK I-9
22 6G
PW R2
Res et
AL AR M
26
26
24
LN K/A
24
22
CT
20
25
18
22
23
16
21
14
19
12
20
17
10
15
8
13
6
18
11
4
9
2
7
16
5
3
1
25
23
21
19
17
15

Figure 2.1 Installing the Rack Mount Brackets

SY S
PW R1
EK I-9
22 6G
PW R2
Res et
AL AR M
26
26
24
LN K/A
24
22
CT
20
25
18
22
23
16
21
14
19
12
20
17
10
15
13
8
6
18
11
4
9
2
7
5
3
1
25
23
21
19
17

Figure 2.2 Installing the Switch

14
12
10
8
6
4
2
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
15
13
11
9
7
5
3
1
10
EKI-9226G Series User Manual

Advertisement

Table of Contents
loading

Table of Contents