Installation Checklist; Remote Gateway 9150 Installation Checklist - Nortel Remote Gateway 9150 Installation And Administration Manual

Nortel remote gateway 9150: user guide
Hide thumbs Also See for Remote Gateway 9150:
Table of Contents

Advertisement

Planning for Remote Gateway 9150 unit installation

Installation checklist

When you are preparing to install your Remote Gateway 9150 unit, use the
following checklist to ensure that you complete all the required processes
properly.

Remote Gateway 9150 Installation Checklist


46
Task
Review the Release Notes for last-
minute product updates.
Ensure you have the latest firmware
and software.
You can route calls over the IP
network, the PSTN, or both.
Determine, at a high level, what you
must do to implement these call routing
methods.
If you want to use the IP network to
route calls, evaluate the IP network to
determine if the network infrastructure
can support voice traffic.
If you want to use the PSTN to route
calls, order trunks from the central
office to the Remote Gateway 9150
unit site.
Note: The Remote Gateway 9150 unit
supports ISDN BRI trunks (S/T or U
interface).
Remote Gateway 9150 Installation and Administration Guide
Standard 4.0
Page 1 of 4
For details, refer to
Remote Gateway 9100 Series
and RLC Release Notes
(NTP 555-8421-102).
Remote Gateway 9100 Series
and RLC Release Notes
(NTP 555-8421-102)
"Deployment options" on
page 75.
your data network
administrator
Remote Gateway 9100
Series Network
Engineering Guidelines
(555-8421-103)
"ISDN BRI information" on
page 82.

Advertisement

Table of Contents
loading

Table of Contents