Drain The Fuel Tank Sludge; Measures Prior To Extended Shut-Down Period - Fayat Group BOMAG BW 213 D-5 Operating Instruction

Single drum roller
Hide thumbs Also See for BOMAG BW 213 D-5:
Table of Contents

Advertisement

Maintenance – As required

8.12.7 Drain the fuel tank sludge

Fig. 219

8.12.8 Measures prior to extended shut-down period

8.12.8.1
Measures before shutting down
240
Protective equip-
ment:
1. Park the machine in secured condition
Ä Chapter 6.8 'Parking the machine in
secured condition' on page 133.
2. Unscrew the drain plug and drain off and
catch approx. 5 litres of fuel.
3. Turn the drain plug tightly back in.
4. Dispose of fuel environmentally.
If the machine is shut down for a longer period
of time, e.g. winter season, the following work
must be carried out:
1. Clean the machine thoroughly.
2. After shutting down store the machine
under cover in a dry and well ventilated
room.
3. Grease the bare piston rods of all hydraulic
cylinders well and pull them in as far as
possible.
4. Spray a thin oil film onto to all lever joints
and bearing points without lubrication.
5. Repair damaged paint; preserve bare
areas thoroughly with anti-corrosive agent.
6. Clean the water separator.
BW 213 D-5
Working clothes
n
Protective gloves
n

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents