Running-In Instructions; General; After 250 Operating Hours - Fayat Group BOMAG BW 213 D-5 Operating Instruction

Single drum roller
Hide thumbs Also See for BOMAG BW 213 D-5:
Table of Contents

Advertisement

Maintenance – Running-in instructions
8.5

Running-in instructions

8.5.1

General

8.5.2

After 250 operating hours

182
The following maintenance work must be per-
formed when running in new machines or over-
hauled engines.
NOTICE!
Danger of engine damage!
– Up to approx. 250 operating
hours check the engine oil level
twice every day.
Depending on the load the engine is
subjected to, the oil consumption
will drop to the normal level after
approx. 100 to 250 operating hours.
1. Tighten all bolted connections on air intake,
exhaust, oil sump and engine mounts.
2. Retighten the bolted connections on the
machine.
3. Retighten the wheel nuts
'Retightening the wheel nuts' on page 219.
4. Oil and filter change on diesel engine
Ä Chapter 8.8.1 'Change engine oil and oil
filter cartridge' on page 196.
5. Oil change in drive axle
'Change the oil in the drive axle'
on page 214.
6. Oil change in wheel hubs
'Changing the oil in the wheel hubs'
on page 215.
BW 213 D-5
Ä Chapter 8.9.9
Ä Chapter 8.9.5
Ä Chapter 8.9.6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents