Christie IMB User Manual page 62

Integrated media block
Table of Contents

Advertisement

Manage Automation
Add Activities to the Credits Macro
You cannot add GPO activities to Solaria One and Solaria One
communication panel does not include a GPI/O port.
1. Tap the Credits macro in the left pane.
2. Tap Add in the Macro Activities list.
3. Select IMB Automation in the Automation Device list.
4. Select GPO Set in the Activity Type list.
5. Select 4 in the Pin Number list.
6. Select Low in the Signal Direction list.
7. Tap Accept.
8. The new activity is added to the Macro Activities list.
9. Tap Save.
10. Repeat steps 2 to 9 and add this activity:
Automation Type
Lights 50% (GPO 4 High, GPO 5 Low)
Add Activities to the End of Show Macro
You cannot add GPO activities to Solaria One and Solaria One
communication panel does not include a GPI/O port.
1. Tap the End of Show macro in the left pane.
2. Tap Add in the Macro Activities list.
3. Select IMB Automation in the Automation Device list.
4. Select GPO Set in the Activity Type list.
5. Select 4 in the Pin Number list.
6. Select High in the Signal Direction list.
7. Tap Accept.
8. The new activity is added to the Macro Activities list.
9. Tap Save.
50
Field Settings
Automation Device: IMB Automation
Activity Type: GPO Set
PIN Number: 5
Signal Direction: Low
Christie Integrated Media Block User Manual
+
projectors because the
+
projectors because the
020-100845-05 Rev. 1 (08-2013)

Advertisement

Table of Contents
loading

Table of Contents